BOQ Estimator for Philippine construction
Automate your BOQ.
Enter your measurements once. Get the bill of quantities, the materials to buy, the schedule and a quotation for your client, priced with Solidstrukt market prices.
First 100 subscribers: ₱5,999 ₱1,999 a year, kept when you renew. Or ₱349 a month until December 31, 2026.
| Item | Amount |
|---|---|
| Footing pundasyon | ₱72,586 |
| Concrete | ₱32,324 |
| Rebar | ₱26,215 |
| Formworks | ₱14,048 |
| Column poste | ₱126,339 |
| Beam biga | ₱127,986 |
| Slab on grade | ₱60,915 |
| CHB wall pader | ₱90,735 |
Three steps to a full estimate
No spreadsheet formulas to fix. You enter the sizes; the app works out every quantity and every peso.
Tick what the project has
Over 80 residential items, from site preparation and footings to fixtures, each with its everyday Filipino word.
Enter the sizes once
Plaster, tiles and paint reuse the wall you already measured. Concrete, rebar and formworks come from one footing.
Get every document
BOQ, bill of materials, schedule with manpower cost, and a quotation ready to print or send to Excel.
Everything an estimate needs
Built by an estimator, for Philippine projects.
Solidstrukt prices
Materials, labor and equipment prices ready to use, updated from real purchases. Use your own anytime.
Live BOQ
Material, labor and equipment per item, with totals that update as you type.
Bill of materials
Cement in bags, bars in pieces, tiles in m², with what each costs.
Schedule and manpower
A bar chart from Philippine productivity rates, with foreman, skilled and laborer costs.
Electrical plan
Circuits, breakers, wire sizes and the load computation, ready for an engineer to check and sign.
Client quotation
Your logo, your client and the totals on one page. Print or save as PDF.
Windows and tiles
Window designs with series and a window schedule. Ceramic or porcelain tiles per m².
Scaffolding rental
H-frames, pipes and clamps by the month, priced from rental rates.
Search in Filipino
Type palitada, pintura or hagdan and go straight to the item.
See what you are pricing
Every concrete item has a top view, a side view with its bars, and a 3D view, drawn from the sizes you enter.
- Footings, columns, beams, slabs and wall footings
- Bars and spacing shown on the drawing
- Sizes you can check at a glance before you send the estimate
Simple price
Try it first. Pay through GCash by the month or by the year when you are ready to save and send your work.
Try it first
See what the app can do.
No payment needed to start.
- Every item, price and drawing
- BOQ, materials, schedule and quotation on screen
- No saving, downloading or printing
Full access
For one estimator, every project.
Until December 31, 2026, then ₱699 a month.30 days of access. No long commitment.About ₱500 a month. Pay once a year.
- Everything in the trial
- Save all your projects
- Download Excel, print and save as PDF
- Pay through GCash
A third of the yearly price
For the first 100 subscribers only
Billed yearly. This price stays every time you renew.
- Everything in Standard
- Price locked when you renew
- ₱4,000 less than Yearly
Questions
Where do the prices come from?
From Solidstrukt's own purchase records and Philippine supplier listings, updated as of October 1, 2026. You can type your own supplier prices for any item, and the app uses yours.
Do I need to be an engineer to use it?
No. Each item asks only for its sizes, with a sketch beside the form. Estimators, contractors and homeowners can all use it. The electrical plan is a draft that a licensed electrical engineer must check and sign.
How do I pay?
Through GCash. Pick Monthly, Yearly or Founding member, scan the QR code, send the amount, and upload the receipt. Your access opens once the receipt is checked.
Can I use it on my phone?
Yes, it runs in the browser. A laptop or desktop is easier for long estimates.
What happens to my work after the trial?
Work in the free trial is not saved. Subscribe to save your projects and to download or print them.
SOLIDSTRUKT